Custom Kitchen Design & Build in Boca Raton
Kitchens designed and built around your layout, your storage needs, and your household — not adapted from a stock plan.
📞 Call (561) 896-9392Stock and semi-custom cabinetry work well for standard room dimensions — but an oddly shaped kitchen, an awkward corner, or a household with specific storage needs (a dedicated coffee station, appliance garage, or butler’s pantry) often needs cabinetry designed for that exact space. Custom design starts from your kitchen’s actual dimensions and how you use it, not from a manufacturer’s standard module sizes.
The tradeoff is lead time and planning. Custom cabinetry is built to order, which means design drawings, material selection, and shop fabrication happen before installation begins — typically eight to fourteen weeks from final design approval. We front-load that planning: detailed layout drawings and elevations are reviewed and approved before anything goes into fabrication, so what arrives on-site matches what you approved.
Space-Specific Design
Cabinetry and layout designed around your kitchen’s actual dimensions, not standard module sizing.
Built-to-Order Cabinetry
Custom storage solutions — appliance garages, pantry systems, specialty inserts — built for your specific needs.
Custom Islands
Islands sized and positioned for your kitchen’s traffic flow, with integrated seating, storage, or prep sinks.
Finish & Hardware Selection
Full control over door style, wood species, finish, and hardware — not limited to a catalog line.
Our Custom Design Process
- In-home measurement and design consultation to establish layout goals and storage needs
- Detailed layout drawings and cabinet elevations reviewed and approved before fabrication
- Written, itemized estimate covering design, materials, and installation
- Coordinated fabrication and installation timeline, with lead times built into your project schedule
How is a custom kitchen different from semi-custom cabinetry?
Semi-custom cabinetry starts from standard module sizes with limited modifications. Fully custom cabinetry is designed and built to your kitchen’s exact dimensions and storage requirements, with no size constraints from a manufacturer’s standard line.
How long does a custom kitchen build take?
Custom cabinetry fabrication typically takes eight to fourteen weeks after final design approval, followed by installation and finish work — most custom kitchen projects run twelve to eighteen weeks total from design to completion.